COTES Group
About us
Mission
Project map
Organization chart
Management
Personnel
Cooperation with Pöyry
History
Business areas
Engineering in Power Industry
Stand-alone Power Sources
Civil Engineering
Certificates
Career
Vacancies
Media-centre
News
Publications
Subscribe to news releases
Contacts
Headquarters
JSC COTES
TOO COTES KAZAKHSTAN
JSC COTES - Sibir
Solutions of the Future
Professionalism Competence Responsibility
group of companies
Sitemap
Sitemap
COTES Group
About us
Mission
Organization chart
Management
Personnel
Cooperation with Pöyry
History
Business areas
Engineering in Power Industry
Activities
Power consulting and project management on behalf of the Owner
Energy and environmental audit
Development of preliminary feasibility studies, assessment of investment in power installations
Comprehensive design and engineering for power-generating facilities
Commissioning,operational, efficiency and performance testing for guarantee commitments
State-of-the-art solutions for industry automation (control and instrumentation systems on a ‘turn-key’ basis)
Reference list
Power generating facilities
2012
Design work for upgrading of 500 kV outdoor switchgear for Ekibastuzskaya GRES-1
2011
Development of investment assessment for construction of TPP of Ozerny Mining and Processing Enterprise
Integrated heat supply control system of thermal energy sources at Chelyabinskaya CHP Plant No.3
Construction expert examination of investment projects for construction of FGC UES branch facilities
Development of design documentation for refurbishment and upgrading of auxiliary building for water treatment plant in the Nizhnevartovskaya GRES
Investment assessment study of TPP construction in Arkhangelskaya Region
Test combustion of off-design coal at Yaivinskaya GRES
Development of a feasibility study for construction of administrative premises at Shaturskaya GRES
Integrated control system at Astaninskaya CHP Plant No.2
Analysis of the possibility to transfer boilers at CHP Plant No.2 to firing improved quality coal
Design work to transfer to a single-stage ash collecting system for units Nos.7,8 of Ekibastuzskaya GRES-1
Thermal (efficiency) testing of turbine equipment at Nazarovskaya GRES
Pre-FS for construction of 600 MW CCGT in Moscow
Express testing of turbine units at TGK-13 facilities
Integrated retrofit of automatic control system of 300 MW power unit at Ugljevik TPP (Bosnia and Herzegovina)
Development of the reconstruction project for a 500 MW power unit No.2 at Ekibastuzskaya GRES-1 Power Pant
Development of design and working documentation for construction of a 110 MW stage II at Blagoveshchenskaya CHP Plant
Commissioning of mechanical equipment for turbine unit No5 at the Karagandinskaya CHP-3
Development of normative and technical documentation for fuel usage at Ulan-Udenskaya CHP-1 plant
Boiler instrumental examination at Yuzhno-Kuzbasskaya GRES
Thermal testing of main and auxiliary turbine equipment for TPP Kostolac-A (Serbia)
Rig firing testing for anthracite-based coal-water fuel combustion
Operational testing of boilers Nos4, 5 in boiler house No10 in Belovo
2010
Development of the daily calculation programme of engineering-and-economical performance at CHP Plant No.2
Examination within the Technological Project section of the project for construction of stage I of CHP Plant No.3 in Astana
Analysis of coal firing in a circular furnace for retrofitted boiler of a 500 MW power unit No.7 at Nazarovskaya GRES Power Plant
Operational testing of boiler TGME-206/KhL of unit No 5 at Pechorskaya GRES power plant
Heat (efficiency) testing and development of energy characteristics for the equipment of TPP Gacko (Bosnia and Herzegovina)
Engineering audit of Karagandinskaya CHP Plant No.3
Analysis of effectiveness of investing into alternative energy sources in Balkhash and Zheskazgan
Performance-and-commissioning boiler tests of a 300 MW power unit at Ugljevik TPP (Bosnia and Herzegovina)
Development of preliminary FS for retrofit of a 300 MW power unit at Cherepetskaya GRES Power Plant
Expansion and retrofit of Ekibastuzskaya GRES-2 with a new 500 MW power unit No.3
Retrofit of the firing system to reduce NOx emissions and replace boiler details within the project for retrofit of a 300 MW power unit No. 5 at Reftinskaya GRES Power Plant
Development of retrofit project for a 500 MW power unit No. 8 at Ekibastuzskaya GRES-1 Power Plant
Development of design and working documentation for replacement of the existing ESP with bag filter within the replacement of a 300 MW power unit No.5 at Reftinskaya GRES Power Plant
2009
Expert evaluation of cost-efficiency assessments of investments for the Kazakhmys corporation branches in 2006-2008
Development of a 3D model for facilities related to the project “Rehabilitation and expansion of Almaatinskaya CHP-1”
Development of a 3D model for facilities related to the project “Rehabilitation and expansion of Almaatinskaya CHP-2”
Development of detailed design and cost estimate documentation for construction of 110 and 220 kV GIS of TANEKO oil refineries complex
Architectural solutions for power installations
Design of Roof Reconstruction of the Main Building of the Branch of OJSC OGK-3 of the Kostromskaya GRES
Design for the Renovation of Glazing of the Station Utility and Amenity building
Detail Design for construction of GIS 110kV and 220kV buildings
3D design of buildings and facilities for CHP-1 and CHP-2 plants Almata-City
Front-end design proposal of the gas-fired boiler house building in Oktyabrsky district, Novosibirsk
Options of the architectural solution for power unit construction
Options of the architectural solution for Molzhaninovka GRES
Options of the architectural solution for Novo-Kuzbasskaya GRES
Options of the architectural solution for Cherepetskaya GRES
Options of the architectural solution for the boiler house
Development of 3D model of facilities for construction of CHP Plant No. 3 in Astana, stage I and II
Innovations
Coal-fired circular furnace boiler design for large power units
Systems for horizontally and vertically staged fuel combustion to reduce NOx emissions
Adjustable low-emission burners
Multi-entry scrubber-ash-collector with a two-stage pre-coagulation
Heat recovery from industrial boilers and production furnaces flue gases
Certificates
Certificate No. HU10/4671 for compliance with ISO 9001:2008 requirements dated 11.02.2010
Certificate 01-П No.142 dated 01.04.2011
Certificate 056/01-П №142с dated 03.02.2010
Certificate 0752.03-2010-5402494461 dated 23.06.2011
Permission for performance testing and tune-up No. 001/2010 dated 19.01.2010
State License No. 15-ГСЛ No.000908 dated 30.06.2009 issued for the Republic of Kazakhstan territory
Energy expert examination permit No.306 dated 27.05.2010 in the territory of the Republic of Kazakhstan
License GT No. 0040083 dated 23.08.2010
Certificate of registration as a member of a non-commercial partnership self-regulating organization Guild of Energy Auditors СРО–Э-007 dated 02.01.2012
Partners
News
Stand-alone Power Sources
Civil Engineering
Activities
General designer services
Front-end engineering, conceptual design, preliminary studies
Elaboration of design estimates
Obtaining project approval with regulatory authorities
Designer supervision services and project engineering assistance
Consulting services for construction Owners
Performing functions of a construction customer
Performing functions of an EPC-contractor
Engineering supervision for construction
Certificates
Certificate No. HU10/4671 for compliance with ISO 9001:2008 requirements dated 11.02.2010
Certificate 0752.03-2010-5402494461 dated 23.06.2011
State License No. 15-ГСЛ No.000908 dated 30.06.2009 issued for the Republic of Kazakhstan territory
License GT No. 0040083 dated 23.08.2010
Certificate 01-П No.142 dated 01.04.2011
Projects
Residential buildings
Apartment houses
Development of detailed design for stage III of multistorey apartment building with commerce premises and underground parking
Development of “RESPECT” housing estate project with public premises and underground parking
Development of design for multistorey housing complex
Detailed design for an apartment house with underground parking on Vatutina Street in Novosibirsk
Development of detailed design for apartment building with administrative premises
Development of detailed design for apartment building, Kuibyshev city
Development of design for apartment building with public premises and built-in underground parking
Development of conceptual design for apartment building with public premises and built-in underground parking
Detailed design for an apartment house with some public premises and underground parking
Development of detailed design for section No.3 of apartment building within the reconstruction project of residential district
Review of design and working for Orlyonok residential complex
Development of design and detail design for two 3-storeyed housing blocks
Development of design and working documentation for the apartment complex
Development of design and working documentation for a 4-section residential house
Schematic design of a residential building
Town Houses
Design development for a complex of low-rise apartment houses
Individual Apartment Houses
Development of detailed design for an individual apartment house
Development of design for an individual apartment house
Development of design for an individual apartment house
Master Plans for Area Developmen
Area development concept of a settlement
Area development concept for a complex of apartment houses
Area development concept
Area development concept
Public buildings
Administrative buildings
Development of conceptual design for reconstruction project of administrative building
Development of conceptual design for reconstruction project of Central Heating Station with a two-storey build-up for public premises
Development of detailed design for public building with underground parking
Development of design for Porshe Business Centre with underground parking
Development of conceptual design for Schlumberger administrative building in Novosibirsk
Development of conceptual design for shopping and entertainment mall with walkways
Development of conceptual design for shopping and entertainment mall with walkways
Development of conceptual design for shopping and entertainment mall with walkways
Development of conceptual design for administrative building
Development of conceptual design for administrative building and hotel complex with built-in parking
Development of detailed design for administrative building with underground parking
Elaboration of design for hotel construction
Development of the project for overstory offices at central heat supply station
Sports and fitness buildings
Development of detailed design for a roofed sports ground at a recreation centre
Pre-design offer on sports facilities for a family entertainment centre
Development of design for sports and health facilities
Development of reconstruction and retrofit project for Central Heating Station No.4 located at the first floor and top of a Health Centre
Health care institutions
Development of detailed design for a building of a Diagnostic Polyclinic branch
Special-purpose buildings
Detailed design for Lexus Sale and Service Centre with an administrative premises and show room
Pre-design offer for construction of Ford Dealer Centre
Development of design for Toyota Dealer Centre
Development of detailed design for Nissan Dealer Centre
Detailed Design for Toyota Dealership on Frunze street, Novosibirsk
Auxiliary Buildings
Development of engineering documentation for pumping station construction
Partners
News
Certificates
Career
Vacancies
Engineering staff
Chief Heating/Combustion Engineer
Chief Project Engineer
Administrative and managerial staff
Media-centre
News
Engineering in power industry
2012
2011
2010
Civil engineering
2011
2010
Stand-alone Power Sources
2012
2011
2010
Publications
Scientific papers of COTES’ employees
2011
2010
2008
2007
Subscribe to news releases
Contacts
Headquarters
JSC COTES
TOO COTES KAZAKHSTAN
JSC COTES - Sibir
(383)328-08-09
cotes@cotes-group.com